HVAC Installation & Maintenance

HVAC & Ventilation

Efficient cooling and healthy air. From VRF and chilled water to fresh-air systems with quality filtration.

IAQ Filtration & Vent
TAB Balanced Airflow

Project Information

Duration:2–10 weeks (typ.)
Budget Range:AED 20k – 1.5M+
Standards:ASHRAE / SMACNA / UAE FLS
Warranty:Workmanship + OEM

Need a system check?

Request a survey for hot spots, noise, or air quality issues. We’ll diagnose and propose fixes.

Get Free Estimate
HVAC ducting and VRF installation in UAE commercial project
Licensed & Insured

Comfort, Efficiency & Clean Air

We engineer and install HVAC systems that keep interiors comfortable and efficient—while meeting ventilation and air-quality targets. Whether it’s a VRF retrofit, chilled-water distribution, or a simple AC service, our teams deliver clean workmanship and compliant close-outs.

Scope & Capabilities

VRF / DX / Chilled Water

System design & selections, piping/condensate, AHU/FCU installs, refrigerant handling and commissioning.

Ducting & Air Distribution

SMACNA-grade ducting, diffusers, grilles, VAVs, kitchen/toilet exhaust and noise control measures.

Ventilation & IAQ

Fresh-air design per ASHRAE, filtration (MERV/HEPA options), pressure balance, and CO₂ monitoring if required.

Testing, Balancing & Maintenance

TAB reports, handover documentation, user training, and AMCs for efficient year-round performance.

Delivery Approach

1

Survey & Design

Heat-load calculations, equipment schedules, duct layouts and coordination with architectural & electrical scopes.

  • Site survey & as-builts
  • Load calcs & selections
  • Shop drawings & BOQ
2

Approvals & Procurement

Authority/landlord submissions, material submittals and ordering of long-lead VRF/chiller items.

  • Compliance documents
  • Material approvals
  • Fast-track sequencing
3

Installation

Ducting, piping, units and controls installed with QHSE supervision and interim inspections.

  • Leak tests & flushing
  • Insulation & sealing
  • Controls integration
4

T&C, TAB & Handover

Functional tests, airflow balancing, O&M manuals, training, and warranty registration.

  • Performance verification
  • Close-out documentation
  • Warranty + optional AMC

Recent HVAC Projects

Selected UAE installations featuring VRF/chilled water, ventilation and TAB handovers.

VRF installation with ducted FCUs and diffusers

Office VRF Retrofit

Energy-efficient VRF system with fresh-air integration and smart controls.

Retail ventilation with filtration and pressure balance

Retail Ventilation Upgrade

Fresh-air design to ASHRAE with filtration and pressure balancing.

Warehouse ventilation and exhaust system with emergency interfacing

Warehouse Vent/Exhaust

High-volume ventilation with emergency interlocks and controls.

FAQs

VRF/VRV, DX split & package units, and chilled water systems with AHUs/FCUs, including controls/BMS interfaces.

Yes—AMCs include periodic inspections, filter replacements, coil cleaning, refrigerant checks and performance reports.

Fresh-air design per ASHRAE and local codes, filtration (MERV/HEPA options), pressure balance and CO₂ monitoring as required.